The Challenge
-
Regular blockages disrupting site operations.
-
Ageing 1960s pitch fibre pipework that had exceeded its design life.
-
Drain rods breaking inside the pipe — showing severe structural weakness.
-
High risk of a complete pipe collapse, which would have required major excavation and costly replacement.
The Results
-
Structural integrity fully restored.
-
Extended the pipe’s service life by several decades.
-
Prevented costly excavation and disruption to the site.
-
A satisfied client with a reliable, future-proof drainage system.
Key Takeaway
This project demonstrates the effectiveness of drain relining for failing pitch fibre pipes. By combining pipe reforming and silicate lining, even severely deteriorated 1960s drains can be given a new lease of life without replacement.

Key Takeaway
This project demonstrates the effectiveness of drain relining for failing pitch fibre pipes. By combining pipe reforming and silicate lining, even severely deteriorated 1960s drains can be given a new lease of life without replacement.

Key Takeaway
This project demonstrates the effectiveness of drain relining for failing pitch fibre pipes. By combining pipe reforming and silicate lining, even severely deteriorated 1960s drains can be given a new lease of life without replacement.